![]() More Metro Maintenance Expected in Summer 2023Ĭommuters in the heart of the District may notice some changes, too. “While Green Line customers in this location experienced a recent summer shutdown for station improvements, the installation of fiberoptics was unable to be addressed at that time due to the use of the tracks to move equipment,” Metro said. The 44-day closure will allow the installation of fiber optic cables. Green Line service will be shut down at West Hyattsville, Hyattsville Crossing, College Park-U of Md. 4: Green Line Closures in Prince George’s County The Vienna and Dunn Loring Orange Line stations are scheduled to be closed for 44 days so crews can replace a 40-year-old steel rail and upgrade old copper cables to fiber optic cables.Ģ022 Metro Ridership Numbers Paint Bleak Picture July 22 to Sept. July 17: Vienna and Dunn Loring Stations Reopen The East Falls Church station (Orange/Silver) and West Falls Church station (Orange) are scheduled to be closed for 23 days. ![]() June 26: East Falls Church and West Falls Church Reopen The Vienna and Dunn Loring stations will be closed for more than six weeks. June 3: Orange/Silver Line Station Closures Begin in Arlington and Fairfax CountiesĮast Falls Church on the Orange and Silver lines will close, along with West Falls Church on the Orange Line, for over three weeks. PEPCO power lines running above the stations must be de-energized while the work is completed. May 12-22: Orange Line Single Tracking Between Stadium-Armory and CheverlyĮxpect delays on the east end of the Orange Line while roofing work is done at the Minnesota Avenue, Deanwood and Cheverly stations. WMATA detailed station closures for summer 2023 in this map.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |